Swimming Pool in Jumeirah, Dubai
The Size of this Pool was 25x5mtr with Two fish ponds and a Water Features. Initial design of the swimming pool was approved by our client. We chosed a land area to accommodate a design already planned. The design was planned with shape, depth, area of the pool, the filtration system, and overall size.
The location selected was ideal for facilitating regular maintenance. We recommended a flat terrain, which can help in large cost reduction for excavation and filling process. A land far away from trees helps to avoid pool filled with leaves. The orientation of the swimming pool is best when constructed facing the sun. This swimming pool was constructed with concrete
Our Solutions
1. Millennium Pools takes care of pool shell i.e. the pool floors and the walls to be structurally sound.
2. Gunite mixture of sand, cement, fly ash, pea stone, and water that is sprayed over a steel reinforced is the procedure employed for the construction of rpools.
3. Millennium Pools design and constructed so that they have good water tightness. This condition must be followed when the pool is full or partially filled.
4. Millennium Pools Always Construct walkway that surrounds the perimeter of the pool.
This walkway finished with a non-slip material that can be easily cleaned and highly durable.
5. We Construct Pools taking in mind young children and non – swimmers, provision given for safety steps all around the walls
6. The pool position must be such that it receives maximum sun as possible. This must receive sufficient amount after afternoon.
7. Our Landscaping near to the swimming pool area have to carried out with proper professional guidance.
Among the construction methods (Using formwork and shotcrete), the most optimal option is the construction by shotcreting. This method develops a monolithic structure that holds the force better. In the formwork method, walls and floor have a gap which has chances to get separated.